DHRUV-PRO 1200W 60A High Power DC 5V-24V Brightness Dimming Adjustable Knob Switch 60 A Rotary Dimmer

DHRUV-PRO 1200W 60A High Power DC 5V-24V Brightness Dimming Adjustable Knob Switch 60 A Rotary Dimmer (Black)

Share

DHRUV-PRO 1200W 60A High Power DC 5V-24V Brightness Dimming Adjustable Knob Switch 60 A Rotary Dimmer  (Black)

Be the first to Review this product
₹2,289
2,849
19% off
i
Available offers
  • Bank Offer100% Cashback upto 500Rs on Axis Bank SuperMoney Rupay CC UPI transactions on super.money UPI
    T&C
  • Bank Offer5% cashback on Flipkart Axis Bank Credit Card upto ₹4,000 per statement quarter
    T&C
  • Bank Offer10% instant discount on SBI Credit Card EMI Transactions, up to ₹1,500 on orders of ₹5,000 and above
    T&C
  • Bank Offer10% off on BOBCARD EMI Transactions, up to ₹1,500 on orders of ₹5,000 and above
    T&C
  • Delivery
    Check
    Enter pincode
      Delivery by30 Jun, Monday|16
      ?
      if ordered before 5:59 PM
      Installation & Demo by29 Jun, Sunday|227
    View Details
    Services
    • Cash on Delivery available
      ?
    Seller
    DHRUVcom
    3.7
    • 7 Days Return Policy
      ?
  • See other sellers
  • Specifications
    In The Box
    Sales Package
    • 1 dimmer
    General
    Brand
    • DHRUV-PRO
    Model Number
    • 1200W 60A High Power DC 5V-24V Brightness Dimming Adjustable Knob Switch
    Model Name
    • 1200W 60A High Power DC 5V-24V Brightness Dimming Adjustable Knob Switch
    Shade
    • BLACK
    Current Rating
    • 60 A
    Power Requirement
    • 1200 W
    Color
    • Black
    Type
    • Rotary
    Number of Poles
    • 4
    Number of Ways
    • 2
    Used For
    • You can conveniently adjust the brightness of your LED bulbs/Led Strip with this dimmer
    Load Type
    • Electro Magnetic
    Additional Features
    Other Features
    • Type:DC 5V-24V 60A Dimmer Dimming way:PWM Input:DC5-24V Output: 2 Channel 5v 240w 12V 600W 24V 1220w, Static power consumption: 1W, There is a black knob, just twirl it to adjust the brightness of LED lights, You can conveniently adjust the brightness of your LED bulbs/Led Strip with this dimmer
    Be the first to ask about this product
    Safe and Secure Payments.Easy returns.100% Authentic products.
    Back to top