EVM 2GB 667 DDR2 2 GB (Dual Channel) PC SDRAM (EVMP2G667U86D)
Get notified when this item comes back in stock.

EVM 2GB 667 DDR2 2 GB (Dual Channel) PC SDRAM (EVMP2G667U86D)

Share

EVM 2GB 667 DDR2 2 GB (Dual Channel) PC SDRAM (EVMP2G667U86D)

3.7
6 Ratings & 0 Reviews
₹1,500
i
+ ₹19 Protect Promise Fee Learn more
Sold Out
This item is currently out of stock
Warranty
5 Years Domestic Warranty
Capacity
Please select a Capacity to proceed
Highlights
  • SDRAM
  • Data rate: DDR2
  • Number of Channels: Dual Channel
  • Compatible Device: PC
Seller
RetailNet
4.2
  • No Returns Applicable
    ?
  • See other sellers
  • Specifications
    In The Box
    Sales Package
    • ONE RAM
    General
    Brand
    • EVM
    Memory Type
    • 2 GB (8 x 128) 667 MHz DDR2 DIMMS
    Memory Standard
    • DDR2-667/PC2-5300
    Compatible Device
    • PC
    Pins
    • 240-pin
    Buffered/Unbuffered
    • Unbuffered
    Model ID
    • EVMP2G667U86D
    Series
    • 2GB 667
    Part Number
    • EVMP2G667U86D
    Memory
    Technology
    • DDR2 DRAM Memory
    CAS Latency
    • 5-6-7-8-9-10-11
    Memory Configuration
    • NA
    Power
    Specified Voltage
    • 1.8 V
    Additional Features
    Other Features
    • Fully Differential Clock Inputs Operation, Differential Data Strobe, BL Switch on The Fly, Auto Self Refresh Supported, JEDEC Standard 78 Ball FBGA, Driver Strength Selected by EMRS, Dynamic On Die Termination Supported, Asynchronous RESET Pin Supported, ZQ Calibration Supported, TDQS (Termination Data Strobe) Supported, Write Levelization Supported, 8 bit Pre-fetch, ROHS Compliant
    Warranty
    Service Type
    • REPLACEMENT
    Not Covered in Warranty
    • PHYSICAL DAMAGE
    Covered in Warranty
    • INTERNAL DEFECTS
    Domestic Term
    • 5 Years
    Warranty Summary
    • 5 Years Domestic Warranty
    Ratings & Reviews
    3.7
    6 Ratings &
    0 Reviews
    • 5
    • 4
    • 3
    • 2
    • 1
    • 3
    • 1
    • 0
    • 1
    • 1
    Have you used this product? Be the first to review!
    Questions and Answers
    Q:Is it suitable for 945gct-m motherboard
    A:Yes
    Supportronic
    Flipkart Seller
    0
    0
    Report Abuse
    Q:Intel Pentium dual core 1.6 GHz Motherboard chipset 945 DDR2 1gb I want to increase my Ram.. please suggest..
    A:Yes but first check with your motherboard manual
    Supportronic
    Flipkart Seller
    0
    0
    Report Abuse
    Q:Is it 184 pins? suitable for 333 Mhz (2700 - oldPCs)
    A:No it will not support
    Supportronic
    Flipkart Seller
    0
    0
    Report Abuse
    Q:is it 2gb ddr2RAM of 800 MHZ iwirh 230 Pins?
    A:No it's 677 MHz
    Supportronic
    Flipkart Seller
    0
    0
    Report Abuse
    Q:IS THIS COMPATIBLE FOR MY PENTIUM DUAL CORE e5300 @ 2.6 GHz PC
    A:YES IT IS SUITABLE
    MEGADEALS17
    Flipkart Seller
    0
    0
    Report Abuse
    Q:Is this 667Mhz frequency Ram or 800 Mhz confirm this becoz i want 667 Mhz for my PC.Because many customers are reporting that they ordered 667Mhz but got that 800 Mhz.....so plz confirm this?
    A:800 kHz. I also ordered 667 kHz and got 800mhz
    Manish Thakrar
    Certified Buyer
    0
    0
    Report Abuse
    Q:does it work on MSI (Micro-Star) Motherboard MS-7312 ?
    A:i think it will but you check with online
    MEGADEALS17
    Flipkart Seller
    0
    0
    Report Abuse
    Didn't get the right answer you were looking for
    Safe and Secure Payments.Easy returns.100% Authentic products.
    You might be interested in
    Keyboards
    Min. 50% Off
    Shop Now
    Computer Components
    Min. 50% Off
    Shop Now
    Motherboards
    Min. 50% Off
    Shop Now
    Monitors
    Min. 50% Off
    Shop Now
    Back to top